New, retrofitted and anticipated coal preparation plants in Russia
Table 1: New, retrofitted and anticipated coal preparation plants in Russia
Name of the plant and coal company, which operates this plant | Coal region | Year of commissioning or retrofitting completion | Rated capacity thous. t • year (design/ actual) | Rank of processed coal | Depth of processing /mm | Main coal preparation processes | Use of thermal drying | Designing company | Export |
---|---|---|---|---|---|---|---|---|---|
1. New coal preparation plants |
|||||||||
CPP «Antonovskaya» ZAO OUK “Yuzhkuzbassugol” |
Kuzbass | 2001 | 3000/4200 | Coking (Z, GZ) | 0 | Jigging, spiral separators, flotation | No | ZAO «Giprougol» | Yes |
CPP «Bachatskaya» OAO «Kuzbassrazrezugol» |
Kuzbass | 2002 | 2500/3000 | Thermal (CC) | 13 | Heavy media separators | No | ZAO «Giprougol» | Yes |
CPP «Sputnik» «Zarechnaya» mine OAO «Mezhdurechye» |
Kuzbass | 2003 | 2400/3000 | Thermal (G) | 0.1 | Heavy media separators and cyclones; spiral separators | No | ZAO «Giprougol» | Yes |
CPP “Krasnogorskaya” OAO «Yuzhny Kuzbass» | Kuzbass | 2002 | 2000 | Thermal (T, A) | 0.1 | Heavy media separators and cyclones; spiral separators | No | ZAO «Giprougol» | Yes |
CPP “Mezhdurechenskaya” OAO «Mezhdurechye» | Kuzbass | 2005 | 3000 | Coking (KC, OC), Thermal. (A) | 0.1 | Heavy media drum and wheel separators and cyclones, spiral separators, flotation | No | ZAO «Giprougol» | Yes |
CPP “Raspadskaya”
ZAO «Raspadskaya ugolnaya companiya» |
Kuzbass | 2005 | 7500 | Coking (K, GZ) | 0 | Heavy media separators and cyclones; spiral separators | No | ZAO «Giprougol» | Yes |
2. Retrofitted coal preparation plants |
|||||||||
CPP «Belovskaya» OOO PO Sibir-Ugol | Kuzbass | 6000 | Coking (Z, GZ, KS) | 0 | Heavy media separators, jigging, spiral separators, flotation | Yes | OAO «Sibgiproshakht», ZAO «Giprougol» | Yes | |
OOO «Kasyanovskaya» OAO «SUEC» | Eastern Siberia | 2005 | 2900 | Thermal (D) | 0.5 | Heavy media separators, jigging | Yes | OAO»Sibgiproshakht» | Yes |
CPP «Kuzbasskaya» OAO UK “Yuzhny Kuzbass” |
Kuzbass | — | 7500 | Coking (GZ, GZO, KC, KO, TC) | 0 | Heavy media separators, jigging, spiral separators, flotation | Yes | OAO»Sibgiproshakht» | No |
CPP «Neryungrinskaya» OAO»Yakutugol» | Yakutia, Sakha Republic | 2003 | 9000 | Coking (K, CC) | 0 | Heavy media cyclones, flotation | Yes | OAO «Sibgiproshakht» | Yes |
CPP «Pechorskaya» OAO «Vorkutaugol» | Pechora coal basin | 2001 | 6000 | Coking (Z) | 0 | Heavy media separators and cyclones; spiral separators, flotation | Yes | SPb «Giproshakht», «PechorNIIproyekt», «Promstory-proyekt» | Yes |
3. Coal preparation plants under construction |
|||||||||
CPP»Severnaya» OAO»Kuzbassugol» | Kuzbass | 2006 | 3000 | Coking (K, KO) | 0 | Jigging, spiral separators, flotation | No | ZAO «Giprougol» | Yes |
CPP «Listvyazhnaya» OAO «Belon» | Kuzbass | 2006 | 6000 | Thermal (D, DG, G) | 0.5 | Jigging | No | ZAO «Giprougol» | Yes |
4. Coal preparation plants being designed |
|||||||||
CPP «Denisovskaya»
OAO «Eurazholding» |
Yakutia, Sakha Republic | 2008 | 3000 | Coking (K) | 0 | Heavy media and spiral separators, flotation | Yes | OOO«KENES» | Yes |
5. Preparing of initial data for designing and feasibility study fulfillment |
|||||||||
CPP «Elginskaya» universal | Yakutia, Sakha Republic | 20000-coking 10000-thermal. | Coking (K); Thermal (CC) | 0 | Heavy media | Yes | Yes | ||
CPP «Kyrgayskaya» OAO«SUEK» | Kuzbass | 6000 | Thermal (G) | ||||||
CPP «Tunguyskaya» OAO«SUEK» | Eastern
Siberia |
3 000 | Thermal (D) | 0.5 | Heavy media | No | Yes | ||
CPP «Stepnaya» OAO «Russky ugol» | Eastern Siberia | 1 500 | Thermal (D) | 13 | Jigging | No | Yes |
Coal ranks according to Russian classification: G— gas coal; GZ—gas-fatcoal; CC—low-caking coal; Z—fat coal; A—anthracite; TA—lean anthracite; K—coking coal; KC—coking-caking coal; KO—coking leaned coal; OC—leaned caking coal; TC—lean caking coal; D—long—flame coal; DG—long-flame gas coal; GZO—gas-fat leaned coal